Friday, March 23, 2012

Lance Deltec Interior

Here is the Deltec we started in December. We went back to prep for the homeowners to lay tile, set Ikea cabinets and vanities and misc. trim.

Here is a view of the finished handrail.



Ikea floating vanity and sink.

Here is our pre-pitch for the shower pan.

Here is the pan liner in with tar paper, lathe and starting pre-pitch.

Blocking in as well as the liner.

Here is the upper, lower and island cabinets in. We put down 3/4 plywood with 1/2 concrete board for tile tops.


Getting the cabinets set and ready for install.

0 comments:

  © Free Blogger Templates Blogger Theme II by Ourblogtemplates.com 2008

Back to TOP