This was a panelized home for Trio Design Build. I jumped on their crew to help set the panels and frame the roof. I was only able to work 7 days, but the panelization process allows for alot of work to happen in a short time.
This is at the end of day 7. The flat roof is dried in and the main roof is almost framed.


This was the end of the 5th day. While the crane was there to set the upper panels, we nailed off the ridge beam and had them set it for us.
Loft is framed and start roof framing over the master bedroom.
Morning 4. Main walls are up. Ready to frame loft and prepare for gable walls.
Morning 3. Getting ready for the main floor panels.

Morning 2. Daylight walls in the basement are in and ready for floor system.
Day 1. Only the foundation is in and ready for framing.