Tuesday, July 6, 2010

Adairs Construction Network

This Deltec Home is a custom home by Adair's Construction Network. This has been a great crew and a beautiful homesite at approximately 3,700 feet in elevation. Scroll to the bottom and work your way up to see our progress. This job started in June and should be complete for move in by November.

High efficient water heater/ boiler.

Radient tubing for the hydronic heating.



Setting the bands for the decks


Here is the covered front porch. This adds great porch space and really helps with the overall look of the house.




A view inside once the center post was removed. The house is engineered to hold itself up and its shape makes it ideal for high wind areas like this.

Cut out for the front porch wing

All the hips in. This is 2 days of progress from setting walls.


Here we are setting the hip trusses.

These panels came pre-sided and with windows installed

Here is a great view while we were setting the wall panels. The walls are 8 foot and the larger the floorplan the more panels you need. This is a 17 sided plan.


This is how the job progressed before I started. Superior wall daylight basement and the main level trusses were in.

0 comments:

  © Free Blogger Templates Blogger Theme II by Ourblogtemplates.com 2008

Back to TOP