Here is the
Deltec we started in December. We went back to prep for the homeowners to lay tile, set
Ikea cabinets and vanities and misc. trim.
Here is a view of the finished handrail.
Ikea floating vanity and sink.
Here is our
pre-pitch for the shower pan.
Here is the pan liner in with tar paper, lathe and starting
pre-pitch.
Blocking in as well as the liner.
Here is the upper, lower and island cabinets in. We put down 3/4 plywood with 1/2 concrete board for tile tops.
Getting the cabinets set and ready for install.
0 comments:
Post a Comment