Castel Renovation
This job was in North Asheville's Beaverdam Neighborhood. We added a third deck off of the master, installed underdeck to create dry space on the lower two decks, new tile and tub in master bath, crown on the main level, radiant floor heat with new bamboo in the art studio, caulk and paint inside and out and weatherization upfits in the attic. 95% of the work was completed via email and phone conversations with the homeowners from Tampa Fla. What great folks!
A view of the underdeck. What a great looking finished product.
A view of the deck band during framing.
A view of the caulk joints on the siding. When we attached the deck, it was observed that the house did not have a drainage plane (tyvex) behind the siding. To help protect the house, we had every siding joint caulked before the house was completely re- painted.
The original master bath, with the corner jaguzzi tub.
Here is a custom butcher block island. This is made from local wormy maple with a cherry inlay. Dave the homeowner has quite the chef's kitchen and this not only looks nice but is used multiple time a day. Stay tuned for an updated larger top to allow him more room to cut and dice!
Here is a view of the lumber right off the truck from the mill. Rough sawn and kiln dried.
Here is some foam air sealing around the edge of our rigid foam. This insulation prevents the heat from the radiant floor from being pulled into the slab below.
0 comments:
Post a Comment