Wednesday, August 24, 2011

Solar attic fan

This house had no insulation in the attic and only a gable vent on one side of the house. With no ridge vent or soffit vents, the attic was super hot. The homeowners bought this solar attic fan and it installed very easily. 2 hours from start to finish. The fan turns itself on as soon as you install it and remove the cardboard.

Read more...

Wardwell Deck

This deck has been a long time in the works. Our friends down the street just finished up an addition on the front of their house and wanted to put this deck on the back. Eric is a fireman so he had 3 days to stay home and help me build the deck. I really enjoy helping homeowners save money and put their own labor into projects.
I squared up the footer location and we got footers and posts set. Once the deck was framed, Eric used his own sweat equity to lay the decking. I set the hand rail posts, installed the stair stringers and built one section of railing and he was able to replicate it and do the rest.

Side view prior to deck.

Back of the house. The flashing was already done some time ago.


Read more...

Sunday, June 26, 2011

Walker Farm

This was a newly purchased home that needed miscellaneous repairs.
We pulled out the old 2 layers of vinyl floor in the mudroom. Below is the multi colored slate we put back down in the laundry/ mud room.

The guest cottage had some rear deck issues. The stairs we basically falling off and not well supported. Here are our new stairs.



The back deck needed some work. We removed the top rail and plumbed all the posts. We shimmed and secured the posts and installed a new 2x6 top rail.



Here is a before picture of the handrail.

The main house has a side deck with no way to get down to the yard. This will be where the garden will go and the homeowners did not want to have to walk through the mudroom and out the garage to get to the side yard.

We removed a section of handrail and built stairs down to the yard.


Read more...

Tuesday, June 21, 2011

Chimney

This is a 1920's West Asheville Home. The house originally had 2 coal fireplaces on the main level and 2 upstairs. We removed the chimney all the way through the house. In the upstairs master bedroom we added a closet.
Here is the finished closet with organizer.

Here is the pile of bricks we carried out of the house. We could fit about 7 bricks per 5 gallon bucket, 2 buckets per guy. After 16 hours we removed all these bricks.

Here is the bedroom closet framing. This entire space was taken up by the chimney.

Here is the bedroom wall prior to our renovation.

Here is the salvage heart pine flooring that was installed down stairs. We lucked out and found nearly the exact flooring and had it weaved in the existing. This was where the chimney went into the foundation below.

The chimney totally split up the kitchen and living room. It also came out into the side entrance door. On the right side of the picture you can see where we flipped the closet door from the back side of the wall to the front side of the side entrance.

This was the view from the side entrance door. The door opened up and you had this chimney right in front of you.


Read more...

Warren Wilson College

Back to school....
We were very excited to do some work at Warren Wilson. It is a super "green" school and has a great philosophy. All the students must work on campus. They have landscaping crews, paint crews, carpentry crews, and even grow their own food.
This is the art building. They used to have a covered bike parking area, but do to other construction projects they needed more faculty office space.
We moved the old window out and put a door to the office in.
Brian laying tile in the new office.
Spray foam in the ceiling.
Rigid foam with taped seems on top of the wall sheathing.
To make the floor elevations work, we had to tear out the old slab. Here is the thickened edge with rigid foam under the wall plate. This will keep cold outside concrete from radiating into the new inside slab.
Here is the original nook. We were able to keep the roof and basically build an exterior wall to enclose it.

Read more...

Wednesday, May 18, 2011

Scala Addition

After 3 years and 2 sets of plans, we finally put our addition on the house. This is a 120 sqft master closet and laundry room. The idea was to maintain the look of the house. The metal, hip roof was crucial to keeping the architecture in tact.


Our house was built in the early 1980's by an architect. For some reason, he decided to frame the entire house with metal studs, floor joists and rafters. Being a carpenter, working with metal could not be more frustrating. Every connection was more difficult than it needed to be.

Here is the North Side of the house prior to construction. Interior pics will follow.







Read more...

Wednesday, May 11, 2011

Metal roof

This turned out to be our 3rd metal roof of the year. When I recieved a call about this job, there was blue tarps over the entire house. Here is a crucial flashing detail behind the chimney. Brian buttoned this up nice.


A view of the back roof



While we were pulling the shingles off, we noticed how easy they were coming off. We could remove entire sections at a time. The roofers had staggered only every other row and half of one shingle. When properly installing shingles they are staggered up I believe 7 courses. Every bundle has the directions on it, which we read everytime we install shingles.


Here is the blue tarp roof.






Read more...

  © Free Blogger Templates Blogger Theme II by Ourblogtemplates.com 2008